MotorGuide Tour Pro 82 Operation Maintenance Installation Warranty Manual page 42

Table of Contents

Advertisement

TROLLING MOTOR INSTALLATION AND OPERATION
a
Objects may cause disturbance to the magnetic field within 91 cm (36 in.)
of the trolling motor
a -
Objects containing iron (such as anchors)
b -
Trolling motor power cables (install no more than 15.2 cm [6 in.] apart)
LINKING THE HANDHELD REMOTE TO THE TROLLING MOTOR
The first time the trolling motor is powered up, the handheld remote will need to
be linked to the trolling motor. The linking procedure is listed as follows:
1. Deploy the trolling motor.
2. Starting with the positive (+) lead, connect the trolling motor power cables
to the battery.
3. Within ten seconds after connecting the power cables, press and hold
the left arrow button and right arrow button on the handheld remote at
the same time. The trolling motor will emit a low tone to confirm that the
handheld remote has been linked to the trolling motor.
b
a
If you wish to clear the linked handheld from the trolling motor's memory,
connect the battery cables to a power source such as the trolling motor battery
or power receptacle, and in less than ten seconds press the left arrow, right
arrow, and propeller buttons at the same time. You will need to complete the
link procedure again to use the handheld remote with the trolling motor.
b
+
-
15.2 cm (6 in.)
a -
b -
c -
c
54153
36
62195
Left arrow button
Propeller button
Right arrow button
eng

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tour pro 109Tour 82Tour 109

Table of Contents