Nmea 2000 Pinpoint Connection - MotorGuide Tour Pro 82 Operation Maintenance Installation Warranty Manual

Table of Contents

Advertisement

TROLLING MOTOR INSTALLATION AND OPERATION
4. Repeat the previous step for the rod end fitting of the gas spring onto the
ball stud located on the base of the mount.
a
e
d
5. Deploy the motor fully to ensure the gas spring operates correctly.
6. Fully stow the motor.
7. Refer to Tour Pro Pedal Resistance Settings to customize the feel of
resistance on the pedal using the remote.

NMEA 2000 Pinpoint Connection

The NMEA 2000 Chartplotter integration connecting Tour Pro via a NMEA 2000
network will enable on‑screen control and motor status by using the Pinpoint
GPS features such as Anchor Lock, Jog, Heading Lock, Cruise Control
on‑screen as well as following custom drawn routes, go‑to waypoint,
programmable turns and more.
INSTALLATION
1. Remove the NMEA 2000 T‑connector from the accessory kit.
NOTE: A 182.9 cm (6 ft.)drop cable may be used between the foot pedal
connection and the provided T‑connector to reach an existing NMEA 2000
network if the provided cable length at the foot pedal will not reach.
eng
b
c
b
70140
a -
Piston end fitting
b -
Ball stud
c -
Gas spring
d -
Rod end fitting
e -
Mount
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tour pro 109Tour 82Tour 109

Table of Contents