3Pt Hitch Air System Installation
1. Cut the nylon tubing into two equal lengths,
approximately 15ft each. Set aside.
2. Screw the coated threaded end of the male elbow
into the air springs opening. Insert hose ends into the
Push to Connect male elbow.
3. Route the nylon tubing along the left and right sides
of frame and up the 3Pt Hitch. See Figure 2-6.
F-1021-0719
4. Cut off any excess nylon tubing and insert nylon
tubing ends into the Push to Connect male elbows
located on the Air Manifold Assembly. Cut ends of
Nylon Tubing should be smooth and burr free. Burrs
can cause slow leaks.
5. Secure Nylon Tubing with tie straps after all
Harnesses have been installed.
6. When Assembly is complete, pressurize the Rear
Roller Air
on page 3-7.)
Figure 2-6: 3Pt Hitch Air System
System.
(See "Rear Roller Air System"
ASSEMBLY
2-7