Acre Meter Installation - Optional - Landoll Brillion SS16 Operator's Manual

Sure stand ag seeder
Hide thumbs Also See for Brillion SS16:
Table of Contents

Advertisement

ASSEMBLY

Acre Meter Installation - Optional

The acre meter consists of three main parts: the Acre
Meter, the Pick-up Switch and the Magnet Wheel
Assembly.
1. Attach the Acre Meter Angle to the end transmission
using two 5/16-18 x 1 Bolts, Lock Washers and Nuts.
See Figure 2-12.
2. Attach the Pick-up Switch to the Acre Meter Angle
using two #8-32 x 1-1/4 Screws, Lock Washers and
Nuts. Do not tighten screws at this time.
3. Attach the Pick-up Switch short ground wire to the
small hole in the Acre Meter Angle with a #6-32 x
1/2" Screw and Nut, remove paint under the wire
connector to assure a good electrical ground
connection. See Figure 2-11.
4. Adjust the Pick-up Switch and bracket so the
centerline of Magnet Wheel Assembly and Pick-up
Switch are horizontally and vertically aligned with
maximum 1/8" between Magnet Wheel Assembly
and Pick-up Switch. Firmly tighten all screws. See
Figure 2-11.
NOTE
Alignment of the Pick-up Switch and Magnet Wheel
Assembly is critical. Improper alignment will cause the
acre counter to record acres erratically or not at all.
5. Attach the Acre Meter Assembly to the Acre Meter
Bracket using 3/8-16 x 1-1/4 Bolt, Flat Washer, Lock
Washer and Nut.
6. Route the cable from the Acre Meter up to the
Pick-up Switch and connect the mating plugs.
7. Do Not secure cable until all other optional
equipment is installed. Securely fasten the cable
using tie straps to prevent wire from becoming
entangled or rubbing on moving parts.
8. Program the acre counter following the instructions
"Electronic Acre Meter Kit - Optional" on
page 3-11.
2-14
Figure 2-11: Acre Meter Mounting Dimension
F-1021-0719

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brillion ssp16

Table of Contents