(4) • Pour in the developer material.
Note: Before pouring in the developer material, be
sure to shake the developer bottle fully.
• By rotating the magnetic roller, check that the
developer material is being transported prop-
erly.
(5) • Reinstall the top cover.
Be sure to install the top cover firmly.
(6)
After placing the developer unit in the proc-
ess unit, move down the lever on each side to
fix the developer unit.
(7) • Reinstall the process unit into the machine.
• Reinstall the screw and the connector.
Nov. 1997 © TOSHIBA
19 - 9
4560/4570 INSTALLATION