Tests and Adjustments
ANSI/NCSL Z540.3–2006 and ISO/IEC 17025 Verification
ANSI/NCSL Z540.3–2006 and ISO/IEC 17025 Verification
To meet the criteria for ANSI/NCSL Z540.3–2006 and ISO/IEC 17025
verification, perform the preliminary checks and all performance tests without
stopping to repair or adjust
completion of all the tests, even if you are aware that the analyzer did not pass.
If there is a failure, complete the verification before you troubleshoot, repair,
and adjust. After the failure has been corrected, repeat the entire set of
performance tests and generate a new set of data.
Figure 3-1
ANSI/NCSL Z5240.3–2006 and ISO/IEC 17025 Verification Flowchart
3-10
1. Stop only in case of a catastrophic failure or cable connector damage
1
. Refer to
Figure 3-1
for test flow. Print data at the
Keysight N5221A/22A Service Guide