forklift or pallet jack to move the packaged cabinets to the installation site, or as
close as possible to the site, before you unload them from the pallets.
This is the basic sequence of the installation steps:
I
I
I
I
I
I
I
I
I
I
I
Each cabinet of your UPS system is shipped on a separate pallet. Use a
1. Prepare your site (described in this chapter).
2. Inspect, unpack, and unload the UPS cabinets (Chapter 4).
3. Attach the caster assemblies, as needed (Chapter 4).
4. Join the cabinets together using supplied hardware (Chapter 5).
5. Wire the cabinets together (Chapters 6- 10, as applicable).
6. Install features, accessories, and/or options (Chapters 6- 10. as
applicable).
7. Complete the Installation Checklist on page 9.
8. Authorized service personnel perform preliminary checks and
startup.
After wiring the UPS system to the facility power and critical load(s), be sure to
ground the system according to local and/or national electrical wiring codes, using
your own cabling and conduit
Install batteries in accordance with all applicable codes and regulations, including
the National Electrical Code (NEC). Article 480.
service personnel. This service is usually offered as pat? of the sales
contract for your UPS system.
authorized