Powerware Plus 80 Operation page 111

Table of Contents

Advertisement

Installing the 'Qpe 2 Battery Cabinet
I
Figure 21 on page 34 shows the Type 2 battery cabinet as it arrives, with the doors
closed. See Drawing 164200263-7 on page A-l 6 for cabinet dimensions.
I
I
JOINING POINTS
for joining to UPS
'I
(See Figure 14
on page 23)
I
I
I
I
I
I
I
I
I
JOINING POINTS '
for joining to
other cabinets
(See Figure 17
on page 25)
\

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Plus 80 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents