the assembly upward to rest against the top of the channel. You may have to
I
adjust the position of the assembly slightfy to slide it over the four studs
protruding into the channel (see Figure 9).
I
I
I
I
6. Place one lockwasher on each stud, then screw one nut onto each stud.
lighten the nuts securely: torque to 25 nM (19.4 lb@.
I
Repeat steps 3 through 5 for the other caster assembly.
I
To lower the cabinet, raise the leveling feet. (See page 14 for instructions on
how to use a hex wrench to raise the leveling feet.) Raise each leveling foot in
turn until it is flush with the base of the cabinet The casters now support the
I
cabinet.
Roll the UPS cabinet carefully to the
I
1 6
Cab/net
location
where it will be installed.