Beluga-C1/C1.5 Training
INSTALLATION
Optional Roll Feeder
Slide 74
This unit allows the user to install another two rolls of paper.
Take care when lifting the unit. It is quite heavy and will need up to four people to
install.
Go over the next few slides before starting to install the machines.
74