Ricoh Beluga-C1 Training page 74

Table of Contents

Advertisement

Beluga-C1/C1.5 Training
INSTALLATION
Optional Roll Feeder
Slide 74
This unit allows the user to install another two rolls of paper.
Take care when lifting the unit. It is quite heavy and will need up to four people to
install.
Go over the next few slides before starting to install the machines.
74

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents