3 How to Install
3.2 Mechanical Installation
3.2.1 Mechanical Mounting
All Frame Sizes allow side-by-side installation except when a
Design Guide).
3
If the IP 21 Enclosure kit is used on frame size A1, A2 or A3, there must be a clearance between the drives of min. 50 mm.
For optimal cooling conditions allow a free air passage above and below the frequency converter. See table below.
* FC 301 only
1.
Drill holes in accordance with the measurements given.
2.
You must provide screws suitable for the surface on which you want to mount the frequency converter. Retighten all four screws.
Table 3.1: Mounting frame sizes A4, A5, B1, B2, C1 andC2 on a non-solid back wall, the drive must be provided with a back plate A due to insufficient
cooling air over the heat sink.
Frame
IP20
A1
A2
A3
A4/A5
B1
B2
B3
B4
C1
C2
C3
C4
* = No screws to tighten
- = Does not exist
18
IP21/IP4X/ TYPE 1 Enclosure Kit
Air passage for different frame sizes
Frame
A1*
A2
size:
a
100
100
(mm):
b
100
100
(mm):
Tightening torque for covers (Nm)
IP21
IP55
*
-
-
*
*
-
*
*
-
-
-
2
-
*
2,2
-
*
2,2
*
-
-
2
-
-
-
*
2,2
-
*
2,2
2
-
-
2
-
-
MG.33.AG.02 - VLT
VLT
is used (see the
A3
A4
A5
B1
B2
100
100
100
100
200
100
100
100
100
200
IP66
-
-
-
2
2,2
2,2
-
-
2,2
2,2
-
-
®
is a registered Danfoss trademark
®
AutomationDrive FC 300 Operating
Options and Accessories
section of the
B3
B4
C1
C2
C3
100
200
200
225
200
100
200
200
225
200
Instructions
C4
225
225
Need help?
Do you have a question about the VLT AutomationDrive FC 301 and is the answer not in the manual?
Questions and answers