V-Wheel Scraper Installation 14 - 16Ft - Landoll Brillion PD Operator's Manual

Transport pulverizer with 1-3/4 trunnion bearing 10ft through 16ft
Table of Contents

Advertisement

V-Wheel Scraper Installation 14 - 16ft

1. With the Rollers on level ground, place 5/8-11
U-Bolts over the frame tube and through the Scraper
Brackets. Hand tighten Locknuts.
F-851R0
Figure 2-24: V-Wheel Scraper Installation, 14 - 16ft
2. The Scraper Bar is pre-assembled with scrapers
attached (spaced approximately 6 inches apart).
Remove the twelve Locknuts from the U-Bolts where
the Scraper Bar will attach to the Scraper Brackets.
See Figure 2-24.
3. Roughly center and attach the Scraper Bar to the
Scraper Brackets with previously removed twelve
1/2-13 Locknuts. Tighten all hardware.
ASSEMBLY
2-27

Advertisement

Table of Contents
loading

Table of Contents