V-Wheel Scraper Installation 10 - 12Ft - Landoll Brillion PD Operator's Manual

Transport pulverizer with 1-3/4 trunnion bearing 10ft through 16ft
Table of Contents

Advertisement

ASSEMBLY

V-Wheel Scraper Installation 10 - 12ft

1. With the Rollers on level ground, place 5/8-11
U-Bolts over the frame tube and through the Scraper
Brackets. Hand tighten Locknuts.
2-26
Figure 2-23: V-Wheel Scraper Installation, 10 - 12ft
2. The Scraper Bar is pre-assembled with scrapers
attached (spaced approximately 6 inches apart).
Remove the eight Locknuts from the U-Bolts where
the Scraper Bar will attach to the Scraper Brackets.
See Figure 2-23.
3. Roughly center and attach the Scraper Bar to the
Scraper Brackets with previously removed eight
1/2-13 Locknuts. Tighten all hardware.
12' Model shown other models similar.
F-851R0