Bridge Hitch Installation - Landoll Brillion PD Operator's Manual

Transport pulverizer with 1-3/4 trunnion bearing 10ft through 16ft
Table of Contents

Advertisement

ASSEMBLY

Bridge Hitch Installation

1. At the front of the Bridge Hitch slide the Gooseneck
Coupler up into the Gooseneck tube, align the top
hole and insert the Bent Pin, secure with Hair Pin
Cotter.
2. Thread a 3/4-10 Nut halfway onto each 3/4-10 x 2
Bolt. Screw them into the 3/4-10 welded nuts on the
Gooseneck tube. Snug the Bolts up against the
Gooseneck Coupler, turn the 3/4-10 Nuts so they are
tight against the welded 3/4-10 Nuts. See
Figure 2-11.
3. Install the Lug Extension onto the Bridge Hitch Lug,
by aligning the Lug Extension Clevis with the Bridge
Hitch Lug and inserting the 1 x 3-5/8 Pin. Secure Pin
by inserting 3/16 x 2 Cotter Pins.
4. With Lug Extension resting flat on top of Bridge Hitch
Tube, insert 3/4-10 U-Bolt and secure with Locknuts.
Tighten.
5. With ports facing attach the 3 x 16 Hydraulic Cylinder
base end to the Lug Extension.
6. Attach the Safety Chain to the Bridge Hitch by sliding
three 1 inch Washers between the two plates on the
end of the chain, place two 1 inch Washers between
the chain and the Bridge Hitch. Insert 1-8 x 9-1/2 Bolt
through the Chain, Washers and Hitch, secure with
1-8 Locknut.
7. Install the Double Stand into the rear of the Bridge
Hitch be sliding it up into the stand tubes, secure with
two 3/4 Pins with Chains.
8. Mount the Manual Storage Canister to the right side
rear of the hitch using two Hose Clamps.
2-10
F-851R0

Advertisement

Table of Contents
loading

Table of Contents