Pulverizer With Lift: Led Lamp And Harness Installation; Pulverizer With Bridge Hitch: Led Lamp And Harness Installation - Landoll Brillion PD Operator's Manual

Transport pulverizer with 1-3/4 trunnion bearing 10ft through 16ft
Table of Contents

Advertisement

Pulverizer with Lift: LED Lamp and
Harness Installation
NOTE
Unless otherwise noted the following installation
instructions apply to all Models.
1. Install outer light mount brackets approximately
2-1/2" from the Bearing Hanger Plate using 1/2-13
U-Bolts and Locknuts. See Figure 2-16.
2. Install the inner Light Mount Brackets approximately
36" from center line using 1/2-13 U-Bolts and
Locknuts. See Figure 2-17.
3. Install the Amber LED inside the Tube Light Shield,
attach to the outer Light Mount Bracket using four
1/4-20 X 1-3/4 Bolts. Secure lamp and shield to Light
Mount Bracket with Flat Washers and Locknuts.
Attach the Decal Bracket and secure with Locknuts.
4. Install the Red LED to the inner Light Mount Bracket
using four 1/4-20 X 1-1/2 Bolts. Secure Lamps to
Light Mount Bracket with Flat Washers and Locknuts.
Attach the Decal Plate and secure with 1/4-20
Locknuts.
5. Attach the Light Module to the Light Module Bracket
using two 1/4-20 X 1-1/2 Bolts and Locknuts.
IMPORTANT
Cords are marked Left or Yellow / Right or Green.
6. Raise the machine if not done previously.
7. Layout the LED Lamp Harness and attach the
harness to the Light Module.
8. Route the left and right 3 plug cord along the frame
and connect to each Red LED Lamp.
9. Route the remaining left and right 2 plug cords along
the left and right of the frame and connect into each
Amber LED Lamp.
10. Layout the 7 Pin Harness and attach the harness to
the Light Module.
11. Route the 7 Pin Harness across the frame and along
the drawbar tube and over to hitch point.
12. Adjust the LED Lamp angle so that the lamp is
vertical (perpendicular) to the ground when the
Pulverizer is in the transport position. Whether the
Pulverizer is towed behind a tractor or a companion
tool, the Light Mount Bracket provides lamp
adjustment for higher or lower drawbar heights,
ensuring that the lamp will always be vertical
(perpendicular) to the ground and clearly viewable
from the front and rear of the machine. See
Figure 2-15.
13. Tighten all hardware.
F-851R0
Figure 2-15: LED Adjustment
14. Bundle and secure any excess cord with tie straps.
15. Apply the reflector decals to Decal Brackets. The
amber reflector decals should be front facing on the
outer Decal Brackets. The red reflector decals and
orange decals should be rear facing on both the inner
and outer Decal Brackets.
IMPORTANT
All wires must be firmly attached to machine frame
members, or hydraulic lines, so they don't sag or
become torn loose by field debris. Use the cable and
hose ties provided.
Check to be sure that wiring at center of machine is
slack enough so as not to be stretched or interfered
with while rotating frame from transport to field
working position and vice versa.
Pulverizer with Bridge Hitch: LED
Lamp and Harness Installation
Install LED Lamps and Led Lamp Harness to the
Pulverizer Frame per Steps 1-10 listed at the left.
Route the 7-Pin Ag Harness, with the Hydraulic Hoses,
along the Bridge Hitch up to the Gooseneck Coupler.
Adjust the LED Lamp angle so that the lamp is vertical
(perpendicular) to the ground when the Pulverizer is in
the transport position. The bracket provides lamp
adjustment for higher or lower Bridge Hitch heights,
ensuring that the lamp will always be vertical
(perpendicular) to the ground and clearly viewable from
the front and rear of the machine. See Fig 2-14.
Tighten all hardware. Bundle and secure any excess
cord with tie straps.
ASSEMBLY
2-17

Advertisement

Table of Contents
loading

Table of Contents