Drawbar With No Lift: Brace Installation - Landoll Brillion PD Operator's Manual

Transport pulverizer with 1-3/4 trunnion bearing 10ft through 16ft
Table of Contents

Advertisement

ASSEMBLY
Drawbar with No Lift: Brace
Installation
1. Bring the rear of the Drawbar into position between
the Frame Hitch Plates at the center of the Frame.
Place two Machinery Bushings on each side
between the Drawbar and the Frame Hitch Plates.
Attach the Drawbar to the Frame with 1-1/4 x 10 Pin,
Flat Washers and 5/16 x 2-1/2 Roll Pins. See
Figure 2-10.
2. Attach the Bracket to the Drawbar using 5/8-11
U-Bolt, Lockwasher and Nuts.
3. Position hitch bracket lug between bracket lugs.
Secure with 1 x 2-1/2 Clevis Pin and 3/16 x 1-1/2
Cotter Pin. Tighten 5/8-11 U-Bolts and Nuts.
4. Attach the Brace to the inside of the Frame Brace
Lug. Slide Flat Washer onto 1-8 X 5-1/2 Bolt and
insert bolt through Brace. Add another Flat Washer
and slide Bolt through Frame Brace Lug. Add Flat
Washers and Locknut, tighten so that the Frame is
free to pivot on the Drawbar. Repeat for the opposite
side. See Figure 2-8.
Figure 2-8: Frame Brace Lugs
5.
Rotate the braces so they are against the Drawbar,
with two holes above and two holes below. Insert
1/2-13 x 7-1/2 Bolts through the holes and secure
with Locknuts.
6. Mount the Hose Support to the Drawbar using 5/8-11
x 2 Bolt, Flat Washer and Locknut. Attach the Jack
using the pin provided. See Figure 2-9.
2-8
Figure 2-9: Hose Support and Jack
7. Attach the Manual Storage Canister using two Hose
Clamps.
F-851R0

Advertisement

Table of Contents
loading

Table of Contents