Drawbar With Lift: Brace Installation - Landoll Brillion PD Operator's Manual

Transport pulverizer with 1-3/4 trunnion bearing 10ft through 16ft
Table of Contents

Advertisement

ASSEMBLY

Drawbar with Lift: Brace Installation

1. Bring the rear of the Drawbar into position between
the Frame Hitch Plates at the center of the Frame.
Place two Machinery Bushings on each side
between the Drawbar and the Frame Hitch Plates.
2.
Attach the Drawbar to the Frame with 1-1/4 x 10 Pin,
Flat Washers and 5/16 x 2-1/2 Roll Pins. See
Figure 2-6.
3. Install Transport Lock Pin into the Frame Lug and
through the Drawbar Lugs. Pin should be under the
drawbar. Secure with a Flat washer and 1/4 x 1-1/4
Lynch Pin. See Figure 2-6.
4. Attach the Brace to the inside of the Frame Brace
Lug. Slide Flat Washer onto 1-8 X 5-1/2 Bolt and
insert bolt through Brace. Add another Flat Washer
and slide Bolt through Frame Brace Lug. Add Flat
Washers and Locknut, tighten so that the Frame is
free to pivot on the Drawbar. Repeat for the opposite
side. See Figure 2-4.
Figure 2-4: Frame Brace Lugs
5.
Rotate the braces so they are against the Drawbar,
with two holes above and two holes below. Insert
1/2-13 x 7-1/2 Bolts through the holes and secure
with Locknuts.
6. Mount the Hose Support to the Drawbar using 5/8-11
x 2 Bolt, Flat Washer and Locknut.
7. Attach the Jack using the pin provided. Attach the
Manual Storage Canister using two Hose Clamps.
See Figure 2-5.
2-4
Figure 2-5: Hose Support and Jack
8. Attach the 3 x 16 hydraulic cylinder base end to the
drawbar lug and extend the cylinder rod to connect
the cylinder clevis to the Frame Lug.
F-851R0

Advertisement

Table of Contents
loading

Table of Contents