Roller Axle Assemblies; Clamp Tightening - Landoll Brillion PD Operator's Manual

Transport pulverizer with 1-3/4 trunnion bearing 10ft through 16ft
Table of Contents

Advertisement

MAINTENANCE

Roller Axle Assemblies

After an initial run of 5-10 hours, check the Roller Axle
Assemblies to insure that the wheels are tight to one
another. If not slide the wheels tight together and adjust
the Axle Clamps.

Clamp Tightening

Tighten the Clamp bolts evenly to achieve equal spacing
between clamp section. Torque to 75 ft/lbs. Thereafter
check assemblies every 50-100 hours.
4-6
Figure 4-4: Roller Axle Assemblies
Figure 4-5: Clamp Tightening
F-851R0

Advertisement

Table of Contents
loading

Table of Contents