Bridge Hitch: Hydraulic System Installation - Landoll Brillion PD Operator's Manual

Transport pulverizer with 1-3/4 trunnion bearing 10ft through 16ft
Table of Contents

Advertisement

ASSEMBLY
Bridge Hitch: Hydraulic System
Installation
Escaping fluid under pressure can be nearly
invisible and have enough force to penetrate the
skin causing serious injury. Use a piece of
cardboard, rather than hands, to search for
suspected leaks. Wear protective gloves & safety
glasses or goggles when working with hydraulic
systems.
Tightening Procedure For JIC 37° Swivel Female
Nuts
1. Check flare and seat for defects.
2. Lubricate the connection.
3. Install hoses without twists.
4. Hand tighten until connection bottoms.
5. Using 2 wrenches to prevent twisting, rotate the swivel
nut 2 wrench flats (1/3 turn).
6. For reassembly, follow the same procedure but tighten
only 1 wrench flat (1/6 turn).
Tightening Procedure For Swivel O-Ring Fittings
1. Lubricate O-Ring and install the fitting until the metal
washer which backs up the o-ring contacts the face of the
boss.
2. Orient the fitting by turning counterclockwise up to 1
turn.
3. Tighten the lock nut using 50-60 foot pounds torque.
Attach the Manual Storage Canister using two 4-1/2
Hose Clamps.
(See "Hydraulic Fitting Torque Specifications" on
page 4-2.)
Do not raise the machine without the use of
hydraulics. This would introduce air into the
hydraulic cylinder. When the transport pin is
removed the frame would lower rapidly possibly
causing injury.
2-14
WARNING
CAUTION
Bridge Hitch Hydraulic Fluid Capacity = 1 gallon
1. Remove Fitting Caps prior to installing Fittings.
2. Screw a 90 degree Male ORB X Male JIC Elbow into
the rod end port and a 90 degree Male ORB x
Female Swivel JIC Elbow Fitting into the base end
port of the Hydraulic Cylinder.
3. Screw a Restrictor into the Ball Valve port that will
connect up to the base end of the hydraulic cylinder
and a Male ORB X Male JIC Adapter Fitting into the
other port of the Ball Valve. Connect the Ball Valve
Restrictor to the Elbow in the base end port of the
Cylinder.
4. Assemble Bulkhead Fittings into the bulkhead plate
located on the top of the of the Bridge Hitch Tube.
5. Connect 3/8 x 185 Hose Assembly to the Cylinder
Rod End Elbow Fitting and 3/8 x 161 Hose Assembly
to the Ball Valve Adapter Fitting.
6. Route hose up the Bridge Hitch connecting them to
the Bulkhead Fittings. Connect 3/8 x 150 Hose
Assemblies to the bulkhead fittings and route them
along the Bridge Hitch to the Gooseneck Coupler.
7. Turn a 90 degree Male JIC x Female Swivel JIC
Elbow Fittings into the end of the Hoses. Assemble
Male ORB X Male JIC Adapter Fittings into Male
Couplers and turn them into Elbow Fittings at the end
of the Hoses.
8. Secure hoses with Twin Clamps, Top Plate and
5/16-18 1-1/4 Bolts in the mounts provided on the
Bridge Hitch. See Figure 2-13.
F-851R0

Advertisement

Table of Contents
loading

Table of Contents