Notched/Heavy Notched Scraper Installation - Landoll Brillion PD Operator's Manual

Transport pulverizer with 1-3/4 trunnion bearing 10ft through 16ft
Table of Contents

Advertisement

ASSEMBLY
Notched/Heavy Notched Scraper
Installation
1. With the rollers on level ground, place four 5/8-11
U-Bolts over the Frame Tube and through the
Scraper Brackets. Hand tighten Flanged Locknuts.
2.
Attach the Scrapers in the bottom of the top two slots
to the Scraper Tube approximately 4 inches apart,
except for the four that will be attached when the tube
is attached to the Scraper Brackets. Secure with
3/8-16 U-bolt and Flanged Locknuts.
3. Roughly center and attach the Scraper Tube to the
Scraper Brackets with the four remaining Scrapers,
3/8-16 U-Bolts and Flanged Locknuts.
4. Adjust the Scrapers to obtain 1/4" clearance from the
Notched Wheels. See Figure 2-21. Tighten all
Hardware.
5. Heavy Notched Scraper Installation is the same.
Figure 2-21: Scraper Gap
2-24
F-851R0

Advertisement

Table of Contents
loading

Table of Contents