Pulverizer With No Lift: Led Lamp And Harness Installation - Landoll Brillion PD Operator's Manual

Transport pulverizer with 1-3/4 trunnion bearing 10ft through 16ft
Table of Contents

Advertisement

ASSEMBLY
Pulverizer with No Lift: LED Lamp and
Harness Installation
NOTE
Unless otherwise noted the following installation
instructions apply to all Models.
1. Install the outer Light Mount Brackets approximately
2-1/2" from the Frame Bearing Hanger Plate.using
1/2-13 U-Bolts and Locknuts. See Figure 2-19.
2. Install the inner Light Mount Brackets approximately
36" from center line using 1/2-13 U-Bolts and
Locknuts. See Figure 2-20.
3. Install the Amber LED inside the Tube Light Shield,
attach to the inside of the outer Light Mount Bracket
using four 1/4-20 X 1-3/4 Bolts. Secure Lamp and
Shield to Light Mount Bracket with Flat Washers and
Locknuts. Attach the Decal Plate and secure with
Locknuts.
4. Attach the Red LED to the inner Light Mount
Brackets using four 1/4-20 X 1-1/2 Bolts. Secure
Lamp to Light Mount Bracket with Flat washers and
Locknuts. Attach the Decal Bracket and secure with
Flat Washers and Locknuts. Ensure the red lens
faces rearward.
5. Attach the Light Module to the Light Module Bracket
using two 1/4-20 X 1-1/2 Bolts and Locknuts.
IMPORTANT
Cords are marked Left or Yellow / Right or Green.
6. Layout the LED Lamp Harness and attach the
harness to the Light Module.
7. Route the left and right 3 plug cords along the left
and right top of frame and connect to each Red LED
Lamp.
8. Route the remaining left and right 2 plug cords along
the left and right top of frame. Plug a 2 plug harness
into each Amber LED Lamp.
9. Layout the 7 Pin Harness and attach the harness to
the Light Module.
10. Route the 7 Pin Harness along the frame and the
drawbar with the hydraulic hoses.
11. Adjust the LED Lamp angle so that the lamp is
vertical (perpendicular) to the ground when the
Pulverizer is in the transport position. Whether the
Pulverizer is towed behind a tractor or a companion
tool, the Light Mount Bracket provides lamp
adjustment for higher or lower drawbar heights,
ensuring that the lamp will always be vertical
(perpendicular) to the ground and clearly viewable
from the front and rear of the machine. See
Figure 2-18.
2-20
Figure 2-18: LED Adjustment
12. Tighten all hardware.
13. Bundle and secure any excess cord with tie straps.
14. Apply the reflector decals to Decal Brackets. The
amber reflector decals should be front facing on the
outer Decal Brackets. The red reflector decals and
orange decals should be rear facing on both the inner
and outer Decal Brackets. See Figure 2-19.
IMPORTANT
All wires must be firmly attached to machine frame
members, or hydraulic lines, so they don't sag or
become torn loose by field debris. Use the cable and
hose ties provided.
15. Attach the SMV Mount to the frame using 5/8-11
U-Bolts and Flanged Locknuts. Attach the SMV sign
to the SMV Mount using 5/16-18 X 1 Bolts, Flat
Washers and Locknuts.
F-851R0

Advertisement

Table of Contents
loading

Table of Contents