Completing the Set Up

3-6-1

Connecting the Unit to a Power Source

The connection of the Voluson® 730Pro / ProV ultrasound unit to a power source should be performed
by a qualified person who has completed basic Voluson® 730Pro / ProV System User Training.
Use only the power cords, cables and plugs provided by or designated by GE Healthcare - Kretztechnik
to connect the unit to the power source.
Prior to connect the Voluson® 730Pro / ProV unit to a power source, verify compliance with all
CAUTION
electrical and safety requirements. Check the power cord to verify that it is intact and of
!! CAUTION: Prior to
hospital-grade. Products equipped with a power source (wall outlet) plug should be connected
to the fixed power socket that has a protective grounding conductor. Never use an adapter or
converter to connect with a power source plug (e.g., a three-prong to two-prong converter).
The unit's power must be supplied from a separate, properly rated outlet to avoid risk
WARNING
WARNING
of fire. Refer to
!! WARNING:
2-3
for rating information. The power cord should not, under any circumstances, be
altered to a configuration rated less than that specified for the current.
Whenever disconnecting the Voluson® 730Pro / ProV system from the electrical outlet, always
CAUTION
observe the safety precautions. First unplug the main power cable from the wall outlet socket,
!! CAUTION:
then from the unit itself. Remove by pulling on the cable connector - DO NOT pull on the cable.
The Voluson® 730Pro / ProV requires all covers!
CAUTION
Operate this system only when all board covers and frame panels are securely in place.
!! CAUTION:
The covers are required for safe operation, good system performance and cooling purposes.
3-6-2

Power On / Boot Up

3-6-2-1

Scanner Power On

1.) Connect the Power Cable to the back of the system.
2.) Connect the Main Power Cable to a hospital grade power receptacle with the proper rated voltage.
Never use an adapter that would defeat the safety ground.
3.) CPN6 only - Switch ON the Circuit Breaker (F1) and the Power Switch of peripherals (F2).
4.) CPN80-81 only - Switch ON the Circuit Breaker at the rear of the system.
Circuit Breaker
Connector for
Mains Power Cable
When AC power is applied to the scanner, the ON/OFF switch on the Control panel is illuminated,
NOTICE
indicating that the System (including the Back-end Processor) is in standby mode.
!! NOTICE:
3-22
DRAFT (A
Section 2-2-2-1 "Voluson® 730Pro / ProV Power Requirements" on page
Figure 3-22 Circuit Breaker at rear of system with CPN6 installed
Section 3-6 - Completing the Set Up
28, 2008)
PRIL
V
® 730P
/ P
OLUSON
RO
RO
S
ERVICE
Power
Switch of
Peripherals
V (BT03)
M
ANUAL

Advertisement

Table of Contents
loading

This manual is also suitable for:

Voluson 730prov

Table of Contents