19 Commissioning of control panel with
Building Technologies
Fire Safety
Commissioning of control panel with interactive detector line
interactive detector line
The commissioning steps in this chapter apply for ↑ detector lines with ↑ line card
(interactive) and line card (interactive, Ex).
You will find information about commissioning an interactive detector line and
about AlgoRex data migration in chapter 'Commissioning of interactive detector
line for AlgoRex data migration [➙ 70]'.
Prerequisites
●
The ↑ line card and the devices on the ↑ detector line have been installed.
●
The acceptance test has been carried out for the detector lines.
●
The ↑ 'Station' has been commissioned.
●
The latest firmware is installed on the 'Station'.
Reading in devices
1. In the main menu, select 'Topology' > 'Hardware tree' > 'Station' > Line card >
Detector line.
2. Press the 'More Options' softkey and select 'Execute commands'.
3. Select the 'Read in installed devices' command.
The devices on the interactive detector line are read in.
The following message is shown following successful reading in: 'Command
executed'
More commissioning steps
You will find additional information about the individual steps on the specified
pages.
1. Test the function of the 'Site' and remedy the problems, if any. Link [➙ 91]
2. Perform the completion tasks. Link [➙ 91]
Replacing an AnalogPLUS device
19
69 | 188
009052_s_en_--
2016-06-02