21.22 Rectify localization errors

21.23 Checking 'Site' function

21.24 Carrying out final commissioning work

Building Technologies
Fire Safety
1. Use 'Topology' > 'Hardware tree' > ↑ 'Station' > ↑ Line card > Detector line to
select the corresponding ↑ detector line in the main menu.
2. Press the 'MoreOptions' softkey and select 'Execute commands'.
3. Select the 'Accept replaced devices' command.
 The fault messages are no longer displayed.
If devices are missing or the device types do not correspond to the FDnet
topology, error messages will continue to be displayed.
Test the function of the ↑ 'Site' in the various test modes.
You will find information on testing a 'Site' in the 'Testing' chapter of document
008838. See chapter 'Applicable documents'.
See also
1 Applicable documents [➙ 11]
1. Check the date and time.
2. Adjust the date and time, if required.
To do this, select 'Settings/administration' > 'System commands' > 'Set
system time' in the main menu.
3. Set the PIN for access levels 1, 2,1, 2,2, and 3.
To do this, select 'Settings/administration' > 'Manage PINs' in the main
menu.
4. Fit the housing cover.
5. Label the installation plate, which should be outside on the housing, with the
site number and the date of commissioning.
To do this, use a solvent-resistant pen.
Detailed commissioning steps
Rectify localization errors
009052_s_en_--