10.5.4 CP Mode Operation Verification

1. Press CP to return to main screen of DC CP mode.
2. High current DC Source settings are shown as Table 10-11. Please follow the model
under CP mode to set the loading watt & I
values of Meter & Load meet to that in Table 10-11.
Source Setting
Voltage
(V)
100

10.5.5 CV Mode Operation Verification

1. Press CV to return to main screen of DC CV mode.
2. High current DC Source settings are shown as Table 10-12. Set loading voltage & I
under CV mode and confirm if the values of Meter & Load meet to that in Table 10-12.
Source Setting
Voltage
(V)
10
80
Table 10-10
Load Setting
R (Ω)
I
p
(A)
100
18
3
100
36
1.5
100
50
1.2
Load Setting
Current
W
(A)
50
1800
50
50
3600
50
4500
Table 10-11
Table 10-12
Current (A)
1
14
Meter & Load
Measurement
R Specification (Ω)
(max)
81.286~129.908
54
2.965~3.036
71.174~168.067
108
1.484~1.517
66.445~202.020
135
1.187~1.213
(max). According to the model to confirm if the
p
Meter & Load
Measurement
P Specification
I
(max)
p
(W)
44.5~55.5
54
1791~1809
39.1~60.9
108
3582~3618
36.4~63.3
135
4477.5~4522.5
Meter & Load
Load Setting
Measurement
V
I
V Specification
max
7.5
2
70
15
69.54~70.46
Verification
Model
63802
63803
63804
Model
63802
63803
63804
7.09~7.41