Rotate: Rotate symbol to any predefined direction in a specific band during Run time. Available
options include 0
Example: There is Liquid level Tank. When the Tag value =0, an arrow should appear pointing in
the Down direction indicating that a discharge of the tank is in progress. When the Tag value = 1, the arrow
should appear in the Up direction indicating filling of tank is in progress.
, 90
, 180
and 270
O
O
O
O
Page 377 of 479