Parameter group Internal hydraulics
7303 Time program for screed drying
Note
Observe the specifications of EN 1264-4. The report to
be provided by the heating contractor must contain the
following heat-up details:
■
Heat-up data with the relevant flow temperatures
Max. flow temperature achieved
■
Operating state and outside temperature at handover
■
Value
Temperature/time profile
/°C Set flow temperature in °C
ϑ
t/d
Time in days
"0"
No temperature/time profile
The current temperature/time profile is termi-
nated. Heating or cooling mode continues.
"1"
Temperature/time profile 1 (to EN 1264-4)
ϑ/°C
50
40
30
20
10
1
5
10
"2"
Temperature/time profile 2 (to ZV parquet and
flooring technology)
ϑ/°C
50
40
30
20
10
1
5
10
"3"
Temperature/time profile 3 (to ÖNORM)
ϑ/°C
50
40
30
20
10
1
5
10
"4"
Temperature/time profile 4
ϑ/°C
50
40
30
20
10
1
5
10
730C Flow temperature for external demand
Set flow temperature for the secondary circuit in the
case of external demand to the heat pump, irrespec-
tive of the room temperature or actual outside temper-
ature.
228
!
15
20
25
30
t/d
15
20
25
30
t/d
15
20
25
30
t/d
15
20
25
30
t/d
(cont.)
Value
Temperature/time profile
/°C Set flow temperature in °C
ϑ
t/d
Time in days
"5"
Temperature/time profile 5
ϑ/°C
50
40
30
20
10
1
5
"6"
Temperature/time profile 6
ϑ /°C
50
40
30
20
10
1
5
"7"
Fixed value temperature program
Duration: 5 days
"8"
Fixed value temperature program
Duration: 10 days
"9"
Fixed value temperature program
Duration: 15 days
"10"
Fixed value temperature program
Duration: 20 days
"11"
Fixed value temperature program
Duration: 25 days
"12"
Fixed value temperature program
Duration: 30 days
!
≙
Setting 1
0.1 °C
t/d
10
15
20
25
30
10
15
20
25
30
t/d