2.1.8. Initial Commissioning
The easiest way of carrying out the initial commissioning is by using the Quick Menu button and
follow the quick set-up procedure using LCP 102 (read table from left to right):
Press
0-01 Language
1-20 Motor power
1-22 Motor voltage
1-23 Motor frequency
1-24 Motor current
1-25 Motor nominal speed
5-12 Terminal 27 Digital
Input
1-29
Adaptation
3-02 Minimum reference
3-03 Maximum reference
3-41 Ramp1 up time
3-42 Ramp1 down time
3-13 Reference site
Q2 Quick Menu
Set language
Set Motor nameplate power
Set Nameplate voltage
Set Nameplate frequency
Set Nameplate current
Set Nameplate speed in RPM
If terminal default is
possible to change this setting to
function
is then needed for running AMA
Automatic
Motor
Set desired AMA function. Enable com-
plete AMA is recommended
Set the minimum speed of the motor
shaft
Set the maximum speed of the motor
shaft
Set the ramping up time with reference
to nominal motor speed (set in par.
1-25)
Set the ramping down time with refer-
ence to nominal motor speed (set in par.
1-25)
Set the site from where the reference
must work
®
MG.33.M2.02 - VLT
is a registered Danfoss trademark
Coast inverse
it is
. No connection to terminal 27