Toshiba ACE-tronics G9 ASD Installation And Operation Manual page 49

Adjustable speed drive
Hide thumbs Also See for ACE-tronics G9 ASD:
Table of Contents

Advertisement

EOI Remote Mounting Using the ASD-MTG-KIT
Note:
See
Figure 26
6.
1.
At the EOI mounting location, mark the 4.60" by 4.50" hole and the four 11/32" screw holes.
2.
Cut the 4.60" by 4.50" rectangular hole.
3.
Drill the four 11/32" holes for the Bezel Plate mount.
4.
Attach and secure the Bezel Plate to the front side of the mounting location using the four 10-32
hex nuts, #10 split lock washers, and the #10 flat washers.
5.
Attach and secure the EOI to the front side of the Bezel Plate using the four 6-32 x 5/16" pan head
screws, #6 split lock washers, and the #6 flat washers.
6.
Connect the extension cable.
EOI ASD-MTG-KIT Mounting Dimensions
Figure 26. EOI Bezel Plate Mounting Dimensions.
ACE-tronics G9 ASD Installation and Operation Manual
Buy: www.ValinOnline.com | Phone 844-385-3099 | Email: CustomerService@valin.com
for the dimensions and the item locations referenced in steps
1
through
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents