Suzuki SY413 Service Manual page 2556

Table of Contents

Advertisement

1. Short deployment harness leads
[A]
[B]
[A]: Left hand steering vehicle
driver side
[B]: Right hand steering vehicle
driver side
1. Stretch deployment harness to its full length 10 m (33 ft).
5) Check that there is no open/short or damage in special tool
(Deployment harness). If any faulty is found, do not use it and
be sure to use new deployment harness.
Special Tool (Deployment harness)
(A): 09932-75030
6) Short the two deployment harness leads together by fully seat-
ing one banana plug into the other.
WARNING:
Deployment wires shall remain shorted and not be
connected to a power source until the air bag is to be
deployed.
Special Tool (Deployment harness)
1. Shorted
(A): 09932-75030
7) Connect deployment harness connector to air bag (inflator)
module (driver or passenger) and lock connector with lock le-
ver.
Special Tool (Deployment harness)
(A): 09932-75030
8) Route deployment harness out the vehicle.
9) Verify that the inside of the vehicle and the area surrounding
the vehicle are clear of all people and loose or flammable ob-
jects.
10) Stretch the deployment harness to its full length 10 m (33 ft).
11) Place a power source near the shorted end of the deployment
harness. Recommended application: 12 Volts minimum, 2
amps minimum. A vehicle battery is suggested.
AIR BAG SYSTEM 9J-87

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sy416Sy418

Table of Contents