Handlebar Set-Up - Suzuki RM-Z250 Service Manual

Hide thumbs Also See for RM-Z250:
Table of Contents

Advertisement

20-32 SERVICING INFORMATION

HANDLEBAR SET-UP

Throttle cable
1
(Pulling cable)
Throttle cable
2
(Returning cable)
A Marking
a 145 mm (5.71 in)
b 190 mm (7.48 in)
c 2 – 3 mm (0.08 – 0.12 in) *3 Tighten the lever side bolt first.
*1
*3
FWD
*4
FWD
FWD
*8
d 121 mm (4.76 in)
e 175 mm (6.89 in)
f 14 – 16 mm (0.55 – 0.63 in)
Align the matching surface of
*1
master cylinder with marking.
Align the matching surface of
*2
clutch lever holder with marking.
*2
FWD
*5
FWD
FWD
Align the matching surface of
*4
throttle case with marking.
Align the " " mark on the left
*5
handlebar grip with marking.
Apply adhesive to the handlebars
*6
and inner of left handlebar grip.
Set the velcro of handlebar pad
*7
to backward.
Align the matching surface of
*8
handlebar holder with marking.
*6
*7

Advertisement

Table of Contents
loading

Table of Contents