Suzuki RM-Z250 Service Manual page 346

Hide thumbs Also See for RM-Z250:
Table of Contents

Advertisement

18-24 FRONT FORK AND STEERING
• Temporarily install the front forks to the steering stem, and
tighten the lower clamp bolts.
• Tighten the steering stem head nut 4 to the specified torque.
 Steering stem head nut: 100 N·m (10.0 kgf-m, 72.5 lbf-ft)
• Install the front fender 5 as shown.
• Reinstall the front forks. (18-18)
• Install the front wheel. (16-6)
• Insert the collar 6 and throttle assembly 7 onto the handle-
bars.
a Washer
b Bolt

Advertisement

Table of Contents
loading

Table of Contents