Handlebar Set-Up - Suzuki RM-Z250 Owner's Service Manual

Hide thumbs Also See for RM-Z250:
Table of Contents

Advertisement

HANDLEBAR SET-UP

Throttle cable
(Pull side)
Upper side
Throttle cable
(Return side)
105˚
Upper side
A
Upper side
Marking on drawing position.
Match slit of handlebar holder with marking.
Assemble throttle cables as to show this drawing.
Marking on drawing position.
Match slit of throttle case with marking.
Marking on drawing position.
Match slit of master cylinder
with marking.
66˚
Put the boot of throttle cable on throttle case.
Make the cut-line of
collor to lower side.
Apply adhesive to inner of grip
and handlebars.
10 – 12 mm
(0.39 – 0.47 in)
Marking on drawing position.
Match slit of clutch lever
with marking.
VIEW A
2.2 mm (0.087 in)
Position of velcro : backward
SERVICING INFORMATION
Marking on drawing position.
Match " " mark of grip (L) with marking.
30˚
Upper side
Approx. 3 mm (0.12 in)
55˚
Upper side
Marking (Left front side)
19-29

Advertisement

Table of Contents
loading

Table of Contents