Suzuki RM-Z250 Service Manual page 238

Hide thumbs Also See for RM-Z250:
Table of Contents

Advertisement

5) If OK, then check the continuity between each terminal and
ground.
 Injector resistance: ∞ Ω (Infinity)
 09900-25008: Multi circuit tester set
 Tester knob indication: Resistance (Ω)
Are the resistance and continuity OK?
YES
Go to Step 2.
NO
Replace the injector with a new one. (13-16)
Step 2
1) Connect a 12 volt battery to the service coupler using the bat-
tery lead wire. (12-19)
2) Insert the needle-point probe to the lead wire coupler.
3) Measure the injector voltage between B/R wire and ground.
 Injector voltage: Battery voltage
 09900-25008: Multi circuit tester set
09900-25009: Needle-point probe set
36890-28H00: Battery lead wire (option)
 Tester knob indication: Voltage ()
Is the voltage OK?
• Gr/W wire open or shorted to ground, or poor F
connection.
• If wire and connection are OK, intermittent trou-
ble or faulty ECM.
YES
• Recheck each terminal and wire harness for
open circuit and poor connection.
• Replace the ECM with a known good one, and
inspect it again.
NO
Short circuit in the B/R wire.
(Terminal – Ground)
(+ B/R – - Ground)
FI SYSTEM DIAGNOSIS 12-55
1
2
2
ECM coupler (Harness side)
V

Advertisement

Table of Contents
loading

Table of Contents