Ap300 Plenum Requirements - Meru Networks AP300 Installation Manual

Hide thumbs Also See for AP300:
Table of Contents

Advertisement

AP300 Plenum Requirements

AP300 Plenum Requirements
When installing the product in an air-handling space, as described in Article
300.22(C) of the NEC (2005), the unit should only be powered by the Ethernet port
(PoE), not by the AC-powered power supply.
When the product is installed in air-handling spaces, the cables employed should be
suitable under NEC Articles 300.22 and 725 and marked accordingly, for use in
plenums and air-handling spaces with regard to smoke propagation, such as CL2-P,
CL3-P, M PP o r C MP.
The products should be installed in accordance with all applicable, local regulations
and practices.
120 Meru Access Point Installation Guide
© 2010 Meru Networks, Inc.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap300iAp1000Ap200Ap150Oap180

Table of Contents