Installing Ap150; Safety Precautions; Unpacking The Ap150; Chapter 5 Installing Ap150 - Meru Networks AP300 Installation Manual

Hide thumbs Also See for AP300:
Table of Contents

Advertisement

This chapter describes how to physically install an AP150. It contains the following
sections:

Safety Precautions

Unpacking the AP150

Installation Requirements
Installing the Access Points
Where to Go From Here
Checking LED Activity
Safety Precautions
IMPORTANT—Read and follow the instructions in Appendix , "Regulatory Information"
on page 109 before installing and operating this product.
This product is intended to be supplied by a UL Listed power supply, marked Class 2
or LPS, and rated minimum 5 Vdc, 3A.
Caution!
in the plenum space.
Unpacking the AP150
Confirm that the AP150 shipping package contains the AP150 access point with
attached mounting bracket.
© 2010 Meru Networks, Inc.
The AP150 is not certified for plenum installations, and should not be installed
Safety Precautions
Chapter 5

Installing AP150

Installing AP150 71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap300iAp1000Ap200Ap150Oap180

Table of Contents