Singapore; Manufacturing Information; Ap300 Plenum Requirements - Meru Networks AP300 Installation Manual

Access point
Hide thumbs Also See for AP300:
Table of Contents

Advertisement

Singapore

For the AP201 Rev 2, AP208 Rev 2, and OAP180, the following approval information applies:
For the AP300 series, the following approval information applies:

Manufacturing Information

The AP150, AP200, and AP300 are built in Taiwan. Factory information is provided under
NDA and upon request.

AP300 Plenum Requirements

When installing the product in an air-handling space, as described in Article
300.22(C) of the NEC (2005), the unit should only be powered by the Ethernet port
(PoE), not by the AC-powered power supply.
When the product is installed in air-handling spaces, the cables employed should be
suitable under NEC Articles 300.22 and 725 and marked accordingly, for use in
plenums and air-handling spaces with regard to smoke propagation, such as CL2-P,
CL3-P, MPP or CMP.
The products should be installed in accordance with all applicable, local regulations
and practices.
© 2009 Meru Networks, Inc.Regulatory Information
Complies with
IDA Standards
DA103798
Complies with
IDA Standards
DB102245
Manufacturing Information
103

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oap180Ap200Ap150

Table of Contents