This chapter describes how to physically install an OAP180. It contains the following
sections:
Safety Precautions
Unpacking the OAP180
Installation Requirements
Installing the Access Points
Where to Go From Here
Checking LED Activity
Safety Precautions
IMPORTANT—Read and follow the instructions in Appendix , "Regulatory Information"
on page 109 before installing and operating this product.
This product is intended to be powered by a UL Listed power supply, marked Class 2
or LPS, and rated minimum 5 Vdc, 3A.
If the installation requires a different supply than the one supplied, make sure you
use a supply displaying the mark of the safety agency that defines the regulations of
the supply in your country.
Caution!
installed in the plenum space.
© 2010 Meru Networks, Inc.
The OAP180 is not certified for plenum installations, and should not be
Safety Precautions
Chapter 6
Installing OAP180
Installing OAP180 87