24.
Carry out the operations in the steps 25 to 27 from the direction
indicated by the arrow in the figure below.
25.
Reinstall the timing belt.
REFERENCE
The timing belt (B) is mounted in the passage indicated in the figure below.
011-202-08E
09.30.2009 FM5540
26.
Reinstall the tension coil spring.
27.
Attach the screw.
u NOTE u
Tension of the timing belt is defined by the tension coil spring. When attaching
the retaining screw of the tensioner, do not apply excessive force to the tensioner
by holding it or by other means.
CR-IR 363 Service Manual
PM-106
PM-106