FujiFilm PROFECT CS Service Manual page 1389

Table of Contents

Advertisement

2.
Securing the Machine with the Anti-Topple
Retainers
u NOTE u
Before drilling holes for embedding the anchor nuts, wear protective goggles.
REFERENCE
When determining the locations for embedding the anchor nuts, temporarily install the
machine and retainers in place, and then mark the locations.
1.
Determine the locations for embedding the anchor nuts.
<Reference values>
011-202-01
08.25.2003 FM4098
2.
Drill holes for embedding the anchor nuts and then embed the anchor
nuts.
3.
Attach the brackets to the machine.
REFERENCE
The brackets to be attached to the right and left sides of the machine are identical
in shape.
CR-IR 363 Service Manual
Appx IN-9
Appx IN-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clearview csClearview csmCr-ir 363

Table of Contents