Labfors 5 – Version for Microorganisms
Before Fermentation/Cultivation
8.2.15 Checking the Hoses and Hose Connections
Page 148 of 205
A detailed description on the calibration can be found in the sepa-
rate operating manual of the touch screen software.
Check and ensure the following items before each cultivation:
Hoses show no kinks and are not able to kink.
Hoses are undamaged and show no weaknesses.
Gas hoses and connections do not show any leaks.
Hose lines are as short as possible.
Hoses are secured with cable ties and/or hose clamps.
Only the pressure hoses supplied by the equipment manufac-
turer are connected as supply lines (water, gas) between the
in-house connections and the equipment.
22 January 2019
Need help?
Do you have a question about the Labfors 5 and is the answer not in the manual?
Questions and answers