Monitoring The Initialization Processes; Figure 52: Switch Initialization Messages - Allied Telesis x550 Series Installation Manual

Stackable 10gigabit intelligent access ethernet switches, alliedware plus v5.4.8-0.2
Hide thumbs Also See for x550 Series:
Table of Contents

Advertisement

Monitoring the Initialization Processes

Bootloader 6.2.3 loaded
Press <Ctrl+B> for the Boot Menu
Loading flash:x550-cap_x550-5.4.8-0.1.rel...
Verifying release... OK
Booting...
Uncompressing Linux... done, booting the kernel
Starting base/first...
Mounting virtual filesystems...
______________
/\ \
/
\ \_
/
\ |
/
\ \
/______/\____\ \/ /____________/
Allied Telesis Inc.
AlliedWare Plus (TM) v5.4.8
Current release filename: x550-5.4.8-0.2.rel
Built: Mon Apr 211:30:30 UTC 2018
Mounting static filesystems...
Attaching to /dev/mtd0...
Mounting file system...
Checking for last gasp debug output...
Checking NVS filesystem...
Mounting NVS filesystem...
Initializing random number generator...
Starting base/hwrandom...
Starting base/dbus...
Starting base/linux...
Starting base/syslog...
It takes about two minutes for the switch to initialize its management
software programs and features, and load the default configuration. You
can monitor the bootup sequence by connecting a terminal or computer
with a terminal emulator program to the Console port. (The Console port
settings are provided in "Starting a Local Management Session" on
page 101.) The switch displays the messages in Figure 52 to Figure 54 on
page 97 on the Console port as it initializes the management software.
____
/ /______\
__/ /| ______ |
|
/
| ______ |
/ /
\ ____ /
Figure 52. Switch Initialization Messages
x550 Series Installation Guide for Stand-alone Switches
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
95

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x550-18xtqAt-x550-18xsqAt-x550-18xspqm

Table of Contents