Figure 44: Installing The Brackets On The At-X550-18Xspqm Switch - Allied Telesis x550 Series Installation Manual

Stackable 10gigabit intelligent access ethernet switches, alliedware plus v5.4.8-0.2
Hide thumbs Also See for x550 Series:
Table of Contents

Advertisement

Brackets positions
to install the switch with
the front panel on the left.
Brackets positions
to install the switch with
the front panel on the right.
3. For the AT-x550-18XSPQm Switch, install the two wall/equipment rack
brackets to the sides of the unit with the eight M4x6mm screws
included with the switch. The brackets should be installed diagonally
across from each other. Refer to Figure 44.
Figure 44. Installing the Brackets on the AT-x550-18XSPQm Switch
4. After attaching the brackets, have another person hold the switch on
the plywood base on the wall while you secure it with the M4x32.3mm
screws included with the switch. Refer to Figure 45 on page 86.
Please follow these guidelines as you position the switch on the wall:
Position it so that the front panel is either on the left or right. Refer
to Figure 43. Do not install it with the front panel facing up or down.
Leave sufficient space from other devices or walls so that you can
access the front and back panels, and for adequate air ventilation.
x550 Series Installation Guide for Stand-alone Switches
85