Installing The At-X550-18Xspqm Switch In An Equipment Rack; Required Items; Switch Orientations In The Equipment Rack; Figure 36: Bracket Holes On The At-X550-18Xspqm Switch - Allied Telesis x550 Series Installation Manual

Stackable 10gigabit intelligent access ethernet switches, alliedware plus v5.4.8-0.2
Hide thumbs Also See for x550 Series:
Table of Contents

Advertisement

Chapter 3: Installing the Switch on a Table or in an Equipment Rack

Installing the AT-x550-18XSPQm Switch in an Equipment Rack

Required Items

Switch
Orientations in
the Equipment
Rack
74
This section contains the procedure for installing the AT-x550-18XSPQm
Switch in a standard 19-inch equipment rack, with the brackets included
with the unit.
The following items are required to install the switch in an equipment rack:
Two equipment rack brackets (included with the switch)
Eight M4x6mm bracket screws (included with the switch)
Cross-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
The switch has two sets of four screw holes on the left and right sides, for
attaching the brackets. Refer to Figure 36.
Figure 36. Bracket Holes on the AT-x550-18XSPQm Switch
You can use the different sets of holes on the switch to install the switch in
the equipment rack in a variety of orientations. You can install it with the
front panel flush with, extending in front of, or recessed behind the front of
the equipment rack. The illustrations in Figure 37 show the switch
orientations with the front panel facing the front of the equipment rack.
Bracket Holes

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x550-18xtqAt-x550-18xsqAt-x550-18xspqm

Table of Contents