Replacing A Non-Redundant Pgm Iota Board - Honeywell Experion PKS User Manual

Profibus gateway module
Hide thumbs Also See for Experion PKS:
Table of Contents

Advertisement

12.4 Replacing a non-redundant PGM IOTA board

This procedure can be performed only while off-process.
CAUTION
We recommend that you proceed with extreme caution whenever replacing any component in a control system. Be
sure the system is offline or in a safe operating mode.
Component replacements may also require corresponding changes in the control strategy configuration through
Control Builder, as well as downloading appropriate data to the replaced component.
Perform the following steps to replace a non-redundant PGM IOTA board
1
On the defective IOTA, loosen screws at each side of the module cover that secures the PGM to the IOTA
board.
2
Loosen the plastic screw on the front of the module cover.Be careful not to strip the plastic screw head.
Carefully remove the PGM from the IOTA board and connector.
3
4
Label and disconnect all cables from the IOTA board connectors, (yellow and green FTE cables, and
PBLink cables).
Do not fully tighten the IOTA mounting screws before installing and tightening the power and ground
screws (24V and COM terminals) which can bind during installation or removal. Follow instructions
carefully.
5
Loosen the four mounting screws only half way that secure the IOTA board to the channel.
Remove the screw from the left side of the IOTA board that connects to the 24 Vdc bus bar.
6
7
Remove the screw from the right side of the IOTA board that connects to the COM bus bar.
Remove completely the four mounting screws securing the IOTA board to the channel and remove the
8
IOTA.
9
Place screws, washers and spacers aside for reassembly.
10
Assemble screws, washers and spacers on the new IOTA board.
Mount the new PGM IOTA board on the channel at the same position as the old IOTA board.
11
12
Insert and thread the four mounting screws only half way to attach the IOTA board to the channel.
Insert and tighten the screw to the left side of the IOTA board that connects to the 24 Vdc bus bar.
13
14
Insert and tighten the screw to the right side of the IOTA board that connects to the COM bus bar.
15
Tighten the four mounting screws securing the IOTA board to the channel.
Set the Device Index address to the same address as the old IOTA using the three rotary FTE DEVICE
16
INDEX switches.
17
Connect FTE-A and FTE-B Ethernet link cables to the RJ-45 connectors on PGM IOTA board.
The yellow Cat5 cable must connect to the FTEA connector on the IOTA.
The green Cat5 cable connects to the FTEB connector on the IOTA.
18
Connect the PBLink cables to the IOTA board.
19
Insert the PGM onto IOTA board making sure that the PGM circuit board mates properly with the IOTA
20
board connector.
21
Secure the PGM to the IOTA board with two screws located at each side of the plastic cover.
Using a #2 Phillips screwdriver, tighten the plastic screw on the front of the module cover. Be careful not to
22
strip the plastic screw head.
23
The PGM boots up into an ALIVE state or a NODB operating state.
Perform a Load with Contents to the PGM.
24
12 PROFIBUS GATEWAY MODULE (PGM) MAINTENANCE
247

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents