Chrysler 1997 Stratus Convertible RHD Service Manual page 877

Table of Contents

Advertisement

THROTTLE CABLE
JX
REMOVAL AND INSTALLATION (Continued)
THROTTLE CABLE—2.5L
REMOVAL
(1) Working from the engine compartment, remove
throttle cable from the throttle body lever (Fig. 48).
Fig. 48 Throttle Cable Attachment to Throttle Body
(2) Push release tang toward dash panel on throt-
tle cable and slide cable out of bracket (Fig. 49).
(3) From inside the vehicle, reach behind the top
of the pedal shaft and push the retainer toward rear
of vehicle. It may be necessary to squeeze retainer
ears together on dash side of pedal shaft.
(4) Lift cable up through slot in top of pedal shaft.
(5) From the engine compartment, pull the throttle
cable and grommet out of the dash panel.
INSTALLATION
(1) From the engine compartment, push the cable
end fitting and grommet into the dash panel.
THROTTLE LEVER
(2) Install cable housing (throttle body end) into
the cable mounting bracket on the engine.
(3) Place cable through slot in top of pedal shaft.
(4) Step on pedal and retainer will snap into place.
(5) From the engine compartment, rotate the
throttle lever forward to the wide open position and
install cable clasp.
SPECIFICATIONS
TORQUE
DESCRIPTION
Accelerator Pedal to Dash Nuts . 12 N·m (105 in. lbs.)
Fuel Filter Mounting Screw . . . 12 N·m (110 in. lbs.)
Fuel Pump Module Locknut . . . . 61 N·m (45 ft. lbs.)
Fuel Tank strap Bolts . . . . . . . . . 60 N·m (44 ft. lbs.)
Fuel Rail Bolts—2.0/2.4L . . . 22.5 N·m (200 in. lbs.)
Fuel Rail Bolts—2.5L . . . . . . . . 12 N·m (106 in. lbs.)
Ignition Coil Mounting Bolts . . 12 N·m (105 in. lbs.)
FUEL SYSTEM
Fig. 49 Throttle Cable Attachment
14 - 23
TORQUE

Advertisement

Table of Contents
loading

This manual is also suitable for:

1997 stratus convertible lhd

Table of Contents