Installation; Packaging Materials - General Binding SureBind 230VAC Service Manual

Table of Contents

Advertisement

1.
Remove shipping tape from carton.
2.
Remove the two foam supports from left and right corners of the machine.
3.
Remove the machine from carton, and remove plastic bag.
4.
Remove power cord from package, and plug power cord in rear bottom of the machine.
5.
After making sure power source voltage is correct, plug power cord into wall outlet.
6.
Plug foot pedal into rear of machine.
7.
The machine is now ready to operate. PLEASE READ THE OWNER'S GUIDE BEFORE
ATTEMPTING TO OPERATE THE MACHINE.
NEW PART
NUMBER
9778053
9776270
9749321
9776949
9777056
9777057
9777058
9781344
9781345
9776367

3.0 INSTALLATION

PACKAGING MATERIALS

DESCRIPTION
Shipping Carton
Plastic Bag
Dust Cover
Pressure Bar Instructions
Bottom Foam/Cardboard Support
Left Top Foam Support
Right Top Foam Support
Power Cord (115 VAC)
Power Cord (230 VAC)
Owner's Manual
3-1
QUANTITY
1
1
1
1
1
1
1
1
1
1
9781858-02/02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Velobind 120vacGusa 120vacSurebind 120vacGestetner surebind 230vacGusa qb 120vac

Table of Contents