Concluding Steps - Fujitsu PRIMERGY CX2560 M4 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX2560 M4:
Table of Contents

Advertisement

System board and components
9.1.4

Concluding steps

Perform the following procedures:
Ê Dispose of the CMOS battery in accordance with local regulations
concerning special waste.
Ê Install the right riser module, see section
page
55.
"Installing the server node in the server enclosure" on page 67
Ê
Ê If applicable, reconnect all external cables.
"Controls and indicators on the server node" on page 448
Ê
"Verifying the system time settings" on page 92
Ê
270
Upgrade and Maintenance Manual
"Installing the riser module" on
CX2550/60/70 M4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2550 m4Primergy cx2570 m4

Table of Contents