Basic hardware procedures
4.2

Shutting down the server node

V
CAUTION!
For further safety information, see chapter
page
33.
I
This step is only required when upgrading or replacing non-hot-plug
components.
Ê Inform the system administrator that the server node will be shut down and
put offline.
Ê Terminate all applications.
Ê Press the On/Off button either on the server node or on the corresponding
front panel to shut down the server node.
I
For more information, see section
server node" on page
I
If the system is running an ACPI-compliant operating system,
pressing the On/Off button will perform a graceful shutdown.
50
448.
Upgrade and Maintenance Manual
"Important information" on
"Controls and indicators on the
CX2550/60/70 M4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2550 m4Primergy cx2570 m4

Table of Contents