Concluding Steps - Fujitsu PRIMERGY CX2560 M4 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX2560 M4:
Table of Contents

Advertisement

Expansion cards and OCP mezzanine cards
CX2570 M4 with PRAID EP520i/540i/580i
Figure 56: Routing the FBU and SAS cables
Ê Route the SAS cable (1) and the FBU cable (2) as shown.
6.4.2.5

Concluding steps

Perform the following procedures:
"Installing the riser module" on page 55
Ê
"Installing the memory slot air duct (Air cooling only)" on page 64
Ê
"Installing the server node in the server enclosure" on page 67
Ê
Ê Reconnect all external cables.
"Controls and indicators on the server node" on page 448
Ê
"Updating expansion card firmware" on page 83
Ê
148
Upgrade and Maintenance Manual
(if applicable)
CX2550/60/70 M4